- Você E Euで完全ノックアウト
the sound of ipanema/paul winter carlos lyra (columbia cs9072)
一昨日はドーハムをはじめとするアメリカジャズメンのブラジルへの楽旅のアルバムをアップしましたが,ブラジル音楽へのジャズメンの傾倒はこの後どんどん顕著になりますよね
- インドの石炭火力機器で内外企業が動
○110203a thailand, bangkok post
タイ,450億バーツの中国のプロジェクト,チャイナ・シティ・コンプレックス
osmep studies options for smes with china complex
the government is looking for ways to help small and medium-sized enterprises (smes) that could be threatened by the development of the 45-billion-baht china city complex for wholesale trade in the eastern suburbs of bangkok.
- 菅総理大臣のダボスの憂鬱
●110131a mekong, english.vietnamnet.vn
メコン河委員会事務局mrc,メコン河下流域一。開発ツールを開発
hydro-power assessment analysis adopted
three multilateral agencies have launched an innovative assessment tool that helps identify the most sustainable sites, designs and operation rules for hydro-power development in the lower mekong river basin. rapid basin-wide hydropower sustainable development tool (rsat),asian development bank,mekong river commission (mrc),world wide fund for nature (wwf),marc goichot, senior infrastructure advisor for the wwf greater mekong programme,jeremy bird, chief executive officer of the mrc secretariat,environmental impact assessments and management plans,hydropower sustainability assessment forum,100 hydro-power projects
- 必要不可欠なもの
●bulugarian army cut sewn ¥3,045
●euro levi's 501 ¥13,440
●leather belt ¥4,095
●pumps ¥9,240
- 日本企業でしょう,これはやばい!
○101018b pakistan, beta.brecorder.com
パキスタンの1100mwコハラ水力で中国企業への委託で決着を図る
kohala hydro project: panel to examine execution on government-to-government basis
the ministry of water and power has failed to get economic co-ordination committee (ecc) of the cabinet's concurrence for the 1100 mw kohala hydropower project, already awarded to a foreign firm in an allegedly non-transparent manner.,memorandum of understanding (mou) was agreed on october 16, 2008,in beijing between the ministry of water and power, government of pakistan and china international water and electric corporation (cwe),located on river jehlum in azad jammu & kashmir (aj&k),aj&k council secretariat on july 31, 2009,ppib through a letter of interest (loi) to cwe on january 15, 2009,cwe successfully updated the feasibility study,satisfaction of panel of experts (poes),unsolicited,aw site hydropower projects on unsolicited basis,from hydropower projects is generally in the range of 7-8 cents/kwh,only 10 percent hydel potential (over 60,000 mw hydro generations in total) of pakistan
|